- Wilford Hall, JBSA-Lackland
- Two hydronic hot water lines frozen in a three-story chase and relocated inside an
occupied work area, isolation valves set between the ice plugs. No shutdown, no
drain-down.
- 2023
- JBSA-Randolph
- Plumbing on a four-month building renovation on the base: copper, condensate,
hydrostatic testing, badged access.
- 2023
- Military Working Dog training lab, JBSA-Lackland
- Plumbing under an Air Force prime contract, domestic water through the dry well.
- 2024
- Texas state hospital
- Boiler and water heater relocation with the associated water and gas piping, on
an occupied campus.
- 2023–24
- NISD — Holmes High School
- Plumbing for fourteen portable buildings: restrooms, cafeteria and serving lines,
lockers and offices.
- 2026
- Our Lady of Perpetual Help
- Full design and turnkey plumbing for the new children’s center restrooms.
- 2026
- Urban Office — all three San Antonio locations
- Plumbing buildouts at Southtown, Century Heights and Medical Center, including the
gas service, and the service plumber for all three since.
- 2022–25
- Park at Presa Apartments
- Replaced the 4″ cut-off and pressure-reducing valve with associated piping and
branch connection.
- 2024
- Saratoga HOA
- Drain port and cut-off valve serving the existing pool house restrooms.
- 2025
- Garcia Residence
- New tile shower with fiberglass pan and an exterior-mount Signature Hardware shower
system.
- 2026
- Private residence
- Turnkey plumbing for a new master suite, under-slab rough through trim.
- 2026